"This trail extension further activates a previously underutilized but important greenway space in our city," Lincoln Parks and Recreation Trails Manager Alex Duryea said in the City of Lincoln's Oct. 23 announcement that construction on the Beal Slough Trail Extension starts November 16.
"Underutilized" fits the trail network. Right now that stretch of southeast Lincoln has no paved path linking the Helen Boosalis Trail to the Yankee Hill Road Trail. It fits the greenway less well. For three years running, UDisc has ranked the Beal Slough Disc Golf Course, at Pine Lake Road and South 60th Street, among the 100 best disc golf courses in the world. It is the only Nebraska course on the list.
Neighbors will hear about this project as a trail extension. For the course, it's the piece that has been missing. The planned route includes a crossing near holes 7 and 12 that joins the course's two sections. To get it, the greenway will share space with construction crews from mid-November until a large part of the work wraps up around September 2027.
A greenway that already draws a crowd
The City lists Beal Slough Greenway as a 47.4-acre conservancy near South 60th Street and Pine Lake Road, with a ballfield and an open field suited to pickup soccer. The 18-hole course opened there in 2021. It plays to par 62, and KLKN's May 2026 story counts five layouts for players of different skill levels. The Lincoln Flying Disc Club's course page lists three sets of tees, White, Blue and Gold, each aimed at a higher player rating. There's also a practice area with two standard baskets, a marksman basket, two warm-up nets on concrete pads and a 500-foot driving range.
Here's how the course has done in UDisc's annual World's Best Disc Golf Courses Top 100:
| Year | World rank | Source |
|---|---|---|
| 2024 | 88th | KLKN, May 4, 2026 |
| 2025 | 70th | City of Lincoln, March 12, 2025 |
| 2026 | 73rd | KLKN, May 4, 2026 |
The 2026 ranking drew from more than 17,000 courses registered on UDisc, and KLKN reported that UDisc also ranks Beal Slough 48th in the United States. The Lincoln Flying Disc Club's course page lists it as No. 1 in Nebraska.
Volunteers made that ranking possible. The City owns the course, and the Lincoln Flying Disc Club built it under an agreement with the City. The nonprofit club also maintains it and raises money for upkeep through suggested fees of $5 a day or $75 a year. The club's course page says those passes are suggested donations, managed with the Lincoln Parks Foundation, that pay for mowing, improvements and maintenance. In KLKN's coverage of the 2026 ranking, Parks and Recreation Director Maggie Stuckey-Ross credited the club's volunteers for helping shape the course.
The trail is being routed through one of the busiest pieces of open ground in southeast Lincoln, and through a course that hasn't been fully stitched together yet.
Following the 2.2 miles
The City's 2025 Annual Trail Report describes a 2.2-mile extension along the Beal Slough channel. From northwest to southeast, it runs like this:
- South 56th Street and London Road. The extension picks up the Helen Boosalis Trail and uses an existing undercrossing at 56th Street.
- Beal Slough Greenway. The path follows the channel southeast through the greenway and past the disc golf course.
- Pine Lake Road. A second existing undercrossing carries the trail under the road.
- Jonathan Gapp Park. The route continues through the park toward South 70th Street.
- Near South 70th Street. The project adds one new bridge and an undercrossing of the railroad.
- South 70th Street and Yankee Hill Road. The trail ties into the Yankee Hill Road Trail.
Because the trail reuses undercrossings at 56th and at Pine Lake Road, walkers and riders won't cross either road at street level on this stretch. The same report notes a separate effort, coordinated with the City's Watershed department, to improve stream sedimentation at the existing undercrossings.
The federal Transportation Alternatives Program pays 80% of the cost. Impact Fees cover the 20% local match.
The crossing near holes 7 and 12
The most interesting detail for anyone who plays Beal Slough is in the City's March 2025 release. Along with the concrete trail, which will make it easier to walk or bike to the course, the planned improvements include more trees and "a culvert crossing near holes 7 and 12 to connect the two sections of the course." UDisc's course listing describes the same spot, with a public bike trail and a permanent bridge planned near holes 7 and 12.
That turns the Duryea quote around. On the trail map, the greenway is a gap. On the course map, it already holds a top-100 layout split into two pieces, and the trail project is how those pieces get joined. When the extension is done, someone could ride the Boosalis Trail to the course and play both halves without leaving the greenway.
What changes on Nov. 16
The same March 2025 release warned that the trail work "will likely cause temporary closures to portions of the course." The Oct. 23 construction announcement gives a start date and an expected finish but says nothing about which holes close or when. The 2026 trail work has no published detour plan either. Before heading out in late November, check the Lincoln Flying Disc Club and the City's trails page for updates.
That trails page still says Beal Slough construction "is planned to begin in early 2027." The Oct. 23 release came later and sets the start at Nov. 16, which moved the schedule up by a season.
The Sunday league calendar on UDisc's Beal Slough DGC League page for the rest of the fall session looks like this:
- Sunday, Nov. 1: listed as canceled.
- Sunday, Nov. 8: Fall Session round on the Sunday League Layout, listed from 6 a.m. to 9 p.m.
- Sunday, Nov. 15: listed as canceled, the day before construction begins.
Fall Session weekly entry is $10 for A pool, $8 for B and $6 for C and D, with $1 off each for annual pass holders. The league page also notes that the portable restroom isn't available during the winter months, which matters for a cold-weather round whether or not crews are on site.
Where the finished trail leads
Once the extension opens, Beal Slough becomes a link between two trail systems that don't touch today.
To the northwest is the Boosalis Trail. The City describes it as running from 17th and Burnham to Old Cheney Road and Highway 2, where it connects with the Rock Island and Old Cheney trails. Near Highway 2, Rock Island also meets the Tierra/Williamsburg Trail, with Wilderness Park west of South 14th Street.
To the southeast is the Yankee Hill Trail. The City lists it among the connections of the Tierra/Williamsburg Trail, which also links to the SouthPointe and Pine Lake trails.
The 2.2 miles through the greenway close a loop. Someone living near South 70th and Yankee Hill could head northwest past the disc golf course, under Pine Lake Road and 56th Street, and onto the Boosalis Trail without riding on a street. Riders coming the other way get a paved route into the SouthPointe and Pine Lake trail network.
The City expects a large portion of the project to be finished by September 2027, weather permitting. That leaves this winter, a spring and a summer of league rounds on a course with work going on beside it.
I'm Miranda Watson, and I'll keep an eye on the Beal Slough work through the winter, including when the crossing near holes 7 and 12 starts taking shape. If you live off Pine Lake Road or Yankee Hill and want to talk about how the new trail connection changes your corner of southeast Lincoln, Let's Connect.